AttachmentSize letter_from_resident.pdf28.27 KB solar_site_-_comments_from_wareham_fire_department.pdf13.52 KB solar_project_-_comments_from_conservation_commissioner.pdf41.1 KB supplemental_information_relating_to_borrego_solar_project_-_proposed_at_140_tihonet_road.pdf14.98 MB 8-20-20_1833112lt001-certified.pdf3.76 MB Transmittal Letter569.75 KB Revised Plans 1.19.202116.02 MB Stormwater Report 1.19.202129.91 MB Comments from Community Land and Water Coalition5.15 MB Letter responding to peer review comments 02-02-2021261.57 KB Revised Plans 02-02-202115.9 MB Response Letter 2.08.21100.47 KB 8-20 - Borrego Solar - 140 Tihonet Road_DRAFT Decision89.5 KB 2021.02.01_warehamconservationcommissioncomments_.pdf7.26 MB 2021.02.1_borrego.chapter61aconversionletter_.pdf53.66 KB 140 Tihonet Road Solar Review Letter38.1 KB comments from the Community Land & Water Coalition 2-17-20211.28 MB final plans for the 140 Tihonet Road PV+ES project 3.8.2116.45 MB Recommendation for the site plan from Consultant Town Engineer 3.8.2136.75 KB Special Permit DRAFT decision 3.8.2190.5 KB Decommissioning estimate Revised 3.08.2021311.24 KB Expanded Environmental Notification Form 64 MB Letter - from the Conservation Committee 3.17.2021338.11 KB Letter from James Kane - AD Makepeace15.06 KB 08-20 Borrego Solar Systems, Inc - Site Plan review 140 Tihonet Road38.17 MB