AttachmentSize Full Set - Site Development Plan 9-8-20229.55 MB anr_subdivision_site_plan_review_form_2.docx23.49 KB Stormwater Report9.64 MB Submittal Packet - Special Permit-Variance Request-Site Plan Review - 9-26-2022 4.32 MB 10-11-2022 Peer Review Cost Estimate42.18 KB 11-7-2022 Request from Continuance - Received from G.A.F. Engineering190.76 KB 12/26/2022 Letter from Christopher Smith, Captain Fire Prevention Wareham Fire Department24.27 KB 1/10/2023 Request for Extension24.55 KB 2-22-23 Building Elevations3.54 MB 2-22-23 Response Letter to Peer Review1.4 MB 2-14-2023 Rev1 Full Set Site Dev Plan12.42 MB 2-22-2023 Supplemental Stormwater Report1.57 MB 2-22-23 Email from Captain Christopher Smith, WFD re: analysis showing proper fire department apparatus access. 51.4 KB 2-22-23 Swept Path Fire truck Access436.71 KB